Education
-
2010 - 2012
University of South Australia
Mechanical, Mechanical
-
2013 - 2014
Ngee Ann Polytechnic
Advance Diploma, Marine & Offshore Technology
- 2004 - 2007
Experience
-
2021 - Present
Orange Delta Pte Ltd
Project Manager
-
2019 - 2021
Boskalis Penta Joint Venture
Senior Engineer (Special Project- CBW)
Project: Pulau Tekong Polder Construction Project – (Boskalis Penta Joint Venture, est value 1.2 Billion)
– Lead Engineer for Special department in spearhead the Cement Bentonite Wall (CBW) development and construction.
– Monitor dredging progress of the clay and sand on site using bucket count against survey result
– Sand capping using split hopper barge, shooter (conveyer belt) and soil pump.
– Monitor the sand movement and sand balance sheet of the entire project.
– Monitor soil improvement works (PVD, Surcharge, CPT) and update against Plan vs. actual progress chart.
– Create / monitor progress reporting chart and highlight critical activity to project
– Ensure project follow as per schedule and update as per site progress
– Interface with all department to gather progress feedback and share schedule target
– Involve in month end progress claim with finance team for monthly claim submission
– Interface with authorities (HDB, MPA, MINDEF, etc) regards to project progress -
2016 - 2019
Global Radiance Ship Management Pte Ltd
Project Manager
Vessel: 5x AHTS/PSV for Farstad – Layup preservation, Batam- Indonesia
FPSO – Armada Claire (62956 GRT) – Layup Preservation, Batam- Indonesia
SKARPOV – LGP tanker (Gross Tonnage: 44190)• Manage Profit &Loss for all project activities and resources while ensuring client satisfaction.
• Vessel dry docking repair and maintenance as well as handle all yard activity related to vessel progress.
• Led annual DNV & lloyd class renewal survey, vessel’s dry dock and repair and maintenance.
• Directly supervises (operationally) Project team (Engineering, Procurement, Construction, Commissioning Project Control, Contract, QHSES, staffing teams).
• Ensures project execution within time, budget and QHSES requirements by allocating resources, managing risks/opportunities and changes.
• Ensure all schedule/Preventive maintenance were timely recorded and monitor.
• Contributes to people development by interfacing with project department and HR.
• Creates a quality and HSE oriented work climate that encourages client satisfaction and HSE consciousness among the project team -
2013 - 2015
Technip
Lead Operation Engineer
Vessel: G1201- 1200T Heavy lift, S-lay pipe lay construction vessel, DP2-
Project: GWF (Australia), Dubai Petroleum Establishment (DPE) Jalilah B Field Development,CNOOC & COOEC Liwan 3-1 / Liuhua 19-5 Field Development (China)
-Vessel operating procedure (stinger installation, tensioner load test, crane heath check, etc.)
-Annual ABS class renewal survey
-DP 2 Converteam system
-S lay mode – top tension hold capacity 375Te (stinger installation)
-Derrick PC-37 Heavy crane of 1200T and 2 x MSB 12 40T
-Operational readiness for the vessel in different countriesVessel: Deep orient – Offshore ROV supporting vessel with 250Te AHC NOV offshore crane, DP2
Project: Balnaves (Australia), CNOOC Panyu Field Deep Water Gas Development Project, South China Sea (Hong Kong), Sarawak Shell Berhad D12 & Laila Field (Malaysia)
-DP 2 Konsberg KPOS
-Flexible cable lay system
-Familiar ROV supporting equipment
-Heavy lifting operation
-Project and client management
-Assist in bidding requirement for project
-Vessel preventive maintenance (InfoEAM, NS5, Refman 2) -
2012 - 2013
Petrofac
Project Engineer
FPSO Opportunity- Tanker Preservation
(Project Engineer)
-Asset Integrity Management (AIM)
-ABS class renewal survey (UTM, flag renewal, etc.)
-Coordination and management of vendor
-New client and partner relationship development
-Preservation and condition assessment of FPSO -
2010 - 2012
EMAS GROUP
Project Engineer
LEWEK EMAS FPSO – Block 12W Development Project
(Project Engineer)
-Budgeting and Scheduling of the project
-Manpower cost control
-Mechanical Engineer (Engineering)
-Package Engineer (Pressure vessel, Electrochlorinator, Air compressor etc.)
-Site commissioning Engineer (Mechanical MC/PC)
-Offshore commissioning (Water injection, first Oil and Gas)
-Offshore construction (Riser and suction hose installation)
-Offshore Repair worksLEWEK ARUNOTHAI – FPSO for EPS north Malay basin Development
(Interface Engineer)
-Interface and work closely with classification society (DNV, ABS etc.)
-Liaison with flag authority regards to change of flag -
2009 - 2010
EMAS GROUP
Assistant Superintendent
Project: DP2 AHTS Vessel 73m, LEWEK SCARLET
– Vessel inspection as client rep
– Liaison with Class surveyor for vessel classification
– QA & QC check on the vessel. (NDT, hyrdotest, certification review, etc.)
– Commissioning of vessel. (DP2 , bollard pull)Project:Ultra deep (3000m) water AHTS Vessel, LEWEK FULMAR
– Launching of vessel preparation works
– Steel cutting and welding inspection
– Logistic management of the vessel (Spare, equipment, certificate, etc.)