Education
-
2014 - 2016
University of Tasmania
Bachelor's Degree, Mechanical Engineering
Activities and societies: University Of Tasmania Rugby Union Team South Hobart, Tasmania Rugby League Team High Distinction (HD) for Final Year Project which is “Performance Efficiency With And Without Online Wash for Gas Turbine at Petronas Gas Berhad, Kerteh”. One of the rugby player in University of Tasmania Rugby Union Team and South Hobart, Tasmania Rugby League Team
Experience
-
2023 - Present
Gamuda Australia
Site Engineer - TBM Tunnel
– As a Site Engineer (TBM Tunnel) for Sydney Metro Western Tunneling Project (WTP) for Gamuda Australia.
– Key Person for Site Acceptance Test (SAT) for the Tunnel Boring Machine S-1348.
– Co-Leader in assembly of TBM facilities such as Steel Ring (Seal Ring), TBM Cradle (Modules), Thrust Frame, etc.
– Assist Shift Boss and Lead the tunnel crew for work planning inside the tunnel.
– Lead the tunnel logistic inside the tunnel (to bring materials in and out to maintain the smooth tunnel operation.
– Involved with 12 hours of shift for runnel production at Rosehill site.
– Managed different people with different department (Tunnel, Mechanical & Electrical, Surveyor, Tunnel Crew, Design and Pre-Cast)
– Lead daily progress meeting with key person on each department to track work for the day and planning the work for night shift and the next day.
– Preparing the Activity Management Plan (AMP), Safe Work Method Statements (SWMS) and Inspection Test Checklist (ITC) for each work related.
– Provide progress report and shift report every shift for reporting regarding work progress and completed work.
– Assists the Senior Project Engineer and Project Engineer in day-to-day activities, coordination of work with sub-contractors / consultants and monitoring of works for compliance with required specification standards. -
2023 - 2023
Sunway Construction Group Berhad
Senior Engineer - Project (M&E)
– As a Senior Engineer – Project (M&E) for Sunway Construction Bhd (Sunway Engineering).
– Lead and Manage Tower A for Mechanical, Electrical Plumbing (for High
Rise Condominium Project, Sunway Belfield, Kg Attap, Bangsar, Kuala Lumpur)
– Involved with Mechanical, Electrical & Plumbing works for Sunway Belfield Projects which includes several sub trades such as Electrical Works, Extra Low Voltage Works including SMATV Fibre optic WIFI, Air Conditioning System, Fire protection System and Lightning Protection System
– To arrange and conduct daily inspection for Slab Wall Inspection (For Conceal Conduit, Pipe Sleeves, Punch Through & all other related works)
– Managing the projects to follow design suit with site conditions, specifications and ensure the projects are within the contract sum with zero (0) Variation Order
– Arrange & Lead Technical Meeting to discuss regarding any issue which require
multiple opinions decisions
– Lead the site walk with Project Stakeholders and to ensure all scope of works to be
done as per approved drawing and specifications
– To coordinate all works inspection and to ensure all progress for MEP works are
within / ahead the Structural & Architecture works to avoid any issue -
2019 - 2023
Air Selangor
Associate (Engineer)
– Lead and Manage 23 numbers of High Impact Capital Expenditure (CAPEX)
Projects in Selangor, Wilayah Persekutuan Kuala Lumpur and Putrajaya in order to
improve the systems, to cope with increasing of water demands and to reduce
water disruptions
– Lead four (4) numbers of project for Upgrading Water Treatment Plant System, three (3) numbers of Unused Reservoir, two (2) numbers of Critical Pump Houses, four (4) numbers of Pipe Replacement, eight (8) numbers of Communication Pipe Replacement and two (2) Renovation Works Projects
– Managing the project to follow design and suit site condition, specifications and
ensure the projects are within the contract sum with zero (0) Variation Order (VO)
– Provides technical expertise and advice to authorities on current water system,
problems faced solutions which can meet with authorities requirement especially
on permit application
– Involve with Project Design, Project Tendering and Contracts Bills and Quantities
– Preparing reports and documents for Certificate of Practical Completion (CPC) and Certificate of Making Good Defect (CMGD)
– Reviewing, analyzing provide solutions, prepare Proposal Report liaising with Board of Management regarding any Design Changes which deviates from the Contract in order to ensure all the projects completed within the timeframes & budget provided
– Arrange & Lead Technical Meeting to discuss regarding any issue which require multiple opinions decisions
– Apply Professional Knowledge obtained from training sharing session from Professional Body (Malaysian Board of Technology, MBOT & Board of Engineering Malaysia, BEM) into projects involved
– Proactively identifies any potential of delay & analyze risks which might caused
in delay and unnecessary additional cost to the projects
– Develops Standard of Procedures (SOP) for Pipe Replacement Projects as a reference to Project Implementor
– Manage14 Consultants & 20 Contractors -
2017 - 2019
MMC-Gamuda
Tunnel Engineer
– As a Tunnel Engineer for Underground Package (Tunnel) for MRT 2 Projects, MRT SSP LINE 2 (UNDERGROUND) MALAYSIA. (In charge of
3 Sites), interfacing with clients for identification of design requirement
– Managed the site and plant establishment (Chiller Plant, Grout Batching Plant, Slurry
Treatment Plant) for the Tunnel Boring Machine (TBM), the machine that bore the
tunnel
– Key Person for TBM delivery (Coordinate with project owner (MRT Corporation),
authorities and site personnel)
– Co-Leader in assembly of TBM facilities such as seal ring, shield cradle, thrust
frame, etc. Provides sufficient skills in piping engineering including pipe integrity
calculation according to relevant codes and standards
– Lead Site Acceptance Test (SAT) for 2 TBM machines before mining (S 776 & S 777)
– Involved with Factory Acceptance Test (FAT) at HERRENKNECHT China for Tunnel Boring Machine (TBM)
– Assist shift boss for work planning inside the tunnel (including logistic inside tunnel).
– Lead the tunnel logistic inside the tunnel (to bring materials in and out to maintain the
smooth tunnel operation)
– Involved in 12 hours shift for production of tunnel at Bandar Malaysia (TU 7), Titiwangsa (TU 1) and (TU 2) sites
– Managed different people with different department (tunnel, electrical, surveyor,
tunnel crew and workers) to be as one team inside the tunnel
– Build rapport and engaged with all level of people for all 8 tunnel drives (TU 1 until
TU 8)
– Managed the rugby team and rugby training for the company to have a work life balance. -
2015 - 2016
PETRONAS GAS BHD
Trainee
– Trainee position for Mechanical and Rotating department
– Involved in overhaul of Centrifugal Compressor in GPP 1 (601 B), washing of gas turbine using offline and online wash and involved in shutdown at KCS B, unit 4 Plant
– Exposed with the software used by the Planner Engineer of the department to purchase equipment needed for compressor and gas turbine overhaul
– Attended morning and weekly meetings with the stakeholder of the PGB Plant to discuss regarding problems faced in the Plants and how to solve it
– Attended work health and safety inductions course
– Plant Visits and Industrial Exposure to several Petronas Operating Units to build rapport and engaged with businesses within the company